References

Shamrock GeoScience references
Shamrock GeoScience references

Pramet

Construction of base and anti-frost layer for the renovation of the community link road in Pramet.

Santa Cruz

Manufacture of base layers for the creation of an operating road for the construction of the new ThyssenKrupp steel mill in Santa Cruz.

Evocrete - Manufacture of base layers for the creation of an operating road for the construction of the new ThyssenKrupp steel mill in Santa Cruz

Surface: approx. 12 km
approx. 8,000 m²
Carried out: July 2008
Time needed: 1 week
Milling depth: 40 cm
Concrete: 190 kg / m³
Task: Creation of an EvoCrete® base layer for an operating road which is used by heavy goods vehicles out of faint gritty, silty and clayey sand.

Alberta

Construction of roads, access roads, drillingpads, yards, etc. for the oil and gas industry.

Evocrete - Alberta - Construction of roads 1
Evocrete - Alberta - Construction of roads 2
Evocrete - Alberta - Construction of roads 3

Saskatchwan

Road construction.

Evocrete - Saskatchwan - Road construction 1
Evocrete - Saskatchwan - Road construction 2
Evocrete - Saskatchwan - Road construction 3

Osa Peninsula

Muddy access road to a tourist camp.

Evocrete - Muddy access road to a tourist camp

A solid EvoCrete® ST road base under a “carpet” of muddy soil. The mud is floated by heavy rainfalls over the EvoCrete® ST road base and results in a loss of handling for truck tires.

Glina

Creation of a link road between Glina and Topusco.

Evocrete - Creation of a link road between Glina and Topusco

Surface: approx. 12 km
Carried out: April / May 2009
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 180 kg / m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the renovation of a link road between two cities.


Našièki

Rehabilitation of a link road between two cities in Našièki.

Evocrete - Rehabilitation of a link road between two cities in Našièki

Surface: approx. 17 km
Carried out: June / July 2009
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 160 kg / m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the renovation of a link road between two cities.


Osiek

Rehabilitation of a district road in Osiek.

Evocrete - Rehabilitation of a district road in Osiek

Surface: 12,000 m²
Carried out: September 2007
Time needed: 5 days
Milling depth: 30 cm
Concrete: 180 kg / m³
Task: Creation of an EvoCrete® base and antirost layer for the sanitation/renovation of a district road.


Glina

Manufacture of base and anti-frost layers and in the same time immobilisation the asphalt in Glina.

Samobor

Manufacture of base and anti-frost layers and broadening of an access road to a quarry in Samobor.

Malabo

Construction of a jetty in Malabo.

Evocrete - Construction of a jetty in Malabo

Surface: 60,000 m²
Carried out: March 2007
Time needed: 4 weeks
Milling depth: 40 cm
Concrete: 180 kg / m³
Task: Creation of base layer with EvoCrete for the building of a shipping pier with container traffic.


Malabo

Manufacture of base layers for infrastructure premises in the harbour.

Ntoum

Manufacture of base layers for a link road between Cocobeach and Ntoum in Gabun.

Evocrete - Manufacture of base layers for a link road between Cocobeach and Ntoum in Gabun

Surface: 27 km lenght
Carried out: July - September 2008
Time needed: approx. 8 weeks
Milling depth: 30 cm
Concrete: 200 kg / m³
Task: Creation of an EvoCrete® ST base and refers to anti-frost layer for the renovation of a link road between two cities.

Baruth

Creation of a wood terminal for Klenk in Baruth near Berlin.

Evocrete - Creation of a wood terminal for Klenk in Baruth near Berlin

Surface: A total of 80,000 m²
Carried out: 2003, 2005 and 2006
Time needed: 2 weeks for each operation
Milling depth: 30 cm
Concrete: 170 kg / m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the transport and storage area which is used by heavy goods vehicles (axle weight 80 tonnes).


Biberach a. d. Riss

Construction of a link road in the county of Biberach a. d. Riss.

Evocrete - Construction of a link road in the county of Biberach a. d. Riss

Surface: approx. 15,000 m²
Carried out: August 2009
Time needed: 5 days
Milling depth: 40 cm
Concrete: 170 kg / m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the renovation of a link road in Fischbach-Eberhardzell.


Dortmund

Construction of the new BMW branch in Dortmund.

Evocrete - Construction of the new BMW branch in Dortmund

Surface: approx. 5,000 m²
Carried out: September 2002
Time needed: 1 week
Milling depth: 80 cm (in a sandwich process)
Concrete: 180 kg / m³
Task: Saving of pile foundation in the area of the new planned building and conversion of existing backfilling into a base layer.


Empfingen

Creation of concrete areas without reinforcement in Empfingen.

Evocrete - Creation of concrete areas without reinforcement in Empfingen

Surface: approx. 5,000 m²
Carried out: February 2009
Time needed: 3 days
Strength of layer: 18 cm
Concrete: 220 kg / m³ CEM I 42,5
Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.


Empfingen

Creation of concrete areas without reinforcement in Empfingen.

Evocrete - Creation of concrete areas without reinforcement in Empfingen

Surface: approx. 8,000 m²
Carried out: February 2009
Time needed: 4 days
Thickness of layer: 18 cm
Concrete: 250 kg / m³ CEM I 42,5
Task: Creation of concrete areas without additional reinforcement and with no expansion joints in the exterior area of a quarry / ready-mix concrete plant.


Ostfildern-Scharnhausen

Construction of a distribution centre in Ostfildern-Scharnhausen.

Evocrete - Construction of a distribution centre in Ostfildern-Scharnhausen

Surface: 10,000 m²
Carried out: December 2000
Time needed: 2 weeks
Milling depth: 100 cm (in 3 steps)
Concrete: 150 kg / m³
Task: Creation of base and anti-frost layer for the building, the factory floor and the transport routes.


Schwieberdingen

Construction of container storage area in Schwieberdingen.

Evocrete - Construction of container storage area in Schwieberdingen

Surface: approx. 7,500 m²
Carried out: 2003
Time needed: 1 week
Milling depth: 35 cm
Concrete: 180 kg / m³
Task: Construction of an EvoCrete® base layer with chip seal surface for high bearing loads.


Zimmern

Creation of a highly frequented access road to a quarry in Zimmern.

Evocrete - Creation of a highly frequented access road to a quarry in Zimmern

Surface: approx. 5,000 m²
Carried out: March 2009
Time needed: 2 days
Thickness of layer: 15 cm
Concrete: 180 kg / m³
Task: Creation of an EvoCrete® ST base layer with used tarry road construction material for an access road (hundreds of trucks every day).


Stuttgart

Creation of frost and base layers for a trans-shipment center for glass recycling in Stuttgart.

Surface: approx. 3,000 m²
Carried out: September 2009
Time needed: 2 days
Milling depth: 30 cm
Concrete: 170 kg/m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for a highly frequented storage area of Rhenus Logistics.


Abtsgmünd

Manufacture of base and anti-frost layers for the foundations of a hall building for the company Holzwerk Bullinger in Abtsgmünd.

Altbach

Manufacturing of bearing courses and frost blankets for a logistics area in Altbach.

Annweiler

Construction of base and anti-frost layer for operating roads and storage areas for Buchmann Karton in Annweiler.

Awengen

Manufacture of frost and base layers and in the same time immobilisation of the asphalt at a link road between Fischbach and Awengen.

Bad Dietzenbach

Manufacturing of bearing courses and frost blankets for a country lane rehabilitation in Bad Dietzenbach.

Bad Urach

Manufacture of base and anti-frost layers for the building of a nursing home in Bad Urach.

Bad Wildbad

Creation of base and anti-frost layers for traffic and parking areas for the building of an EDEKA hypermarket in Bad Wildbad.

Bad Wildbad

Redevelopment of an incline with embankment construction and incline reinforcement for traffic areas of an EDEKA hypermarket in Bad Wildbad.

Baruth

Construction of base and anti-frost layer from the existing soil for the expansion of the wood terminal (30,000 m²) for Klenk AG in Baruth.

Baruth

Construction of base and anti-frost layer from the existing soil for the expansion of the wood terminal (45,000 m²) for Klenk AG in Baruth.

Barver

Creation of base and anti-frost layers for the creation of a storage fermenter, substrate warehouse, storage containers for the expansion of a biogas plant in Barver.

Blumberg

Creation of base and anti-frost layers for the traffic areas for Straub Wellpappe cardboard factory in Blumberg.

Böblingen

Construction of base and anti-frost layer for traffic areas for the US army in Böblingen.

Börlingen

Manufacture of base and anti-frost layers for the extension of a scrapyard for company Elektro Elser in Börlingen.

Büttelborn

Manufacture of base and anti-frost layers and in the same time construction of a running surface for a mobile crane in Büttelborn.

Deizisau

Manufacture of base layer near the base plate for the building of an aluminium foundry for FAW IMCO in Deizisau.

Denkingen

Manufacture of base and anti-frost layers for the building of a hall for the company Seid in Denkingen.

Deutwang-Kalkofen

Construction of base and anti-frost layer for the renovation of the tar-based community link road in Deutwang-Kalkofen.

Duisburg

Creation of base and anti-frost layers for the car park of a PLUS hypermarket in Duisburg.

Empfingen

Creation of a concrete area without additional reinforcement for heavy load traffic in Empfingen.

Fellbach-Öffingen

Manufacture of base and anti-frost layers for the building of a hall for the company Kemmler in Fellbach-Öffingen.

Frittlingen

Manufacture of base and anti-frost layers for the building of a multipurpose hall for the community Frittlingen.

Gerstetten

Manufacturing of bearing courses and frost blankets for a public connection road in Gerstetten.

Göppingen

Creation of base and anti-frost layers for building of a LIDL supermarket and a sports retail warehouse in Göppingen.

Grötzingen

Creation of base and anti-frost layers for the building of an all-day children’s nursery for the community of Aichtal in Grötzingen.

Hoffenheim

Manufacturing of bearing courses and frost blankets below a floor slab in Hoffenheim.

Holzgerlingen

Construction of base layer from the existing soil for the factory floor of a new industrial building in Holzgerlingen.

Karlsruhe-Durlach

Creation of base and anti-frost layers for the building of a heavy goods vehicle area for a drink supplier in Karlsruhe-Durlach.

Kirchheim u. T.

Manufacture of base and anti-frost layers for sanitation of the west-south ring road of the company Siemens AG in Kirchheim u. T.

Kornwestheim

Creation of base and anti-frost layers for a new warehouse as an extension of the logistics centre of Spedition Era in Kornwestheim.

Kornwestheim

Creation of base and anti-frost layers for the creation of a storage fermenter, substrate storage, weights and operating premises for the building of a biogas plant in Kornwestheim.

Kusterdingen

Manufacture of frost and base layers for a new town ring road in Kusterdingen.

Landau

Manufacture of base and anti-frost layers and in the same time immobilisation of old scrapyard areas in Landau.

Landau

Manufacture of base and anti-frost layers for the extension of a scrapyard for the company Klotz in Landau.

Linachtal

Manufacture of frost and base layers and in the same time immobilisation of the asphalt in Linachtal.

Lindenberg

Creation of base and anti-frost layers for the building of a district road in Lindenberg.

Ludwigsau-Mecklar

Manufacture of base and anti-frost layers for the extension of ProLogis logistics-centres in Ludwigsau-Mecklar.

Mannheim

Creation of base and anti-frost layers for the building of a shipping yard for Südzucker AG in Mannheim.

Meckenbeuren

Manufacturing of bearing courses and frost blankets and immobilization of contaminated soils for a retail park in Meckenbeuren.

Melle

Base layer from the existing soil for the factory floor of a printers in Melle.

Minden

Manufacturing of bearing courses and frost blankets for a timber yard in Minden.

Münsingen

Creation of base and anti-frost layers for the renovation of a community link road in Münsingen.

Nehren

Manufacturing of bearing courses and frost blankets and immobilization of contaminated soils for the expansion of the industrial site of Schromet in Nehren.

Neidenstein

Manufacture of base and anti-frost layers for the building of the company Umdasch in Neidenstein.

Niederbusch

Creation of base and anti-frost layers for an agricultural road for the community of Gangelt in Niederbusch.

Niedereschach

Manufacture of base and anti-frost layers for the extension of a production hall for the company Jerger in Niedereschach.

Oberrot

Construction of base and anti-frost layer from the existing soil for the expansion of the wood terminal (12,000 m²) for Klenk AG in Oberrot.

Ohmden

Manufacture of frost and base layers for an agricultural road with asphalt in Ohmden.

Remseck

Manufacturing of bearing courses and frost blankets for the Neckar bicycle path in Remseck.

Reutlingen

Creation of base and anti-frost layers for the building of traffic and parking areas of a Lidl supermarket in Reutlingen.

Reutlingen

Manufacture of frost and base layers as a foundation for a container terminal in Reutlingen.

Rickenbach

Rottenburg

Manufacture of base and anti-frost layers for the extension of a production hall for the company VIACOR in Rottenburg.

Salzwedel

Creation of a base and anti-frost layer for the bedding of natural stone near the Altstadt using a “Mixed-in-Plant” procedure, city of Salzwedel.

Schwieberdingen

Creation of base and anti-frost layers for the shipping yard of TIP-CTR in Schwieberdingen.

Sinzheim

Creation of base and anti-frost layers for the building of a Park & Ride complex for the city of Sinzheim.

Spraitbach

Manufacture of base and anti-frost layers for the sanitation of the Beutenhofer road(serious damages of the road construction) in Spraitbach.

Sulzbach

Construction of base layer for the building of a REWE supermarket in Sulzbach.

Waldmössingen

Manufacturing of bearing courses and frost blankets for a court rehabilitation of Katz in Waldmössingen.

Weissenstein

Creation of base and anti-frost layers for creation of clamp silos for the building of a biogas plant in Weissenstein.

Weissenstein

Manufacture of base and anti-frost layers for the building of a drying hall as a part of a biogas plant in Weissenstein.

Wolfegg

Manufacturing of bearing courses and frost blankets and immobilization of bituminous pavements for internal factory connection roads of the sawmill Klenk AG in Wolfegg.

Road construction and rehabilitation work in the Seven Sisters of India.

Evocrete - Road construction and rehabilitation work in the Seven Sisters of India

During Monsoon season a land slide flowing over the road and the massive rainfalls washed the unstabilized soil under the road base on a length of 6 meter completely out.
The bearing capacity of the EvoCrete® ST road base is strong enough, that a 2,5 ton pick up truck pass over the damaged section.


Meghalaya

Construction of Ampati-Purakharia Road (28.00 km) under SPA Garohills.

Evocrete - Construction of Ampati-Purakharia Road (28.00 km) under SPA Garohills

Surface: 146.025 m²
Carried out: Oct. 2012
Time needed: 4 Months
Milling depth: 30 cm
Concrete: 180 kg / m³ + 2% EvoCrete®


Meghalaya

Construction of Road from Betasing to MellimWest-Garo Hills.

Evocrete - Construction of Road from Betasing to MellimWest-Garo Hills

Surface: 70,500 m²
Carried out: March 2012
Time needed: 3 Months
Milling depth: 30 cm
Concrete: 180 kg / m³ + 2% EvoCrete®


Meghalaya

Strengthening and Improvement of Riding Quality East Garo Hills-Megahalaya on Songsak-Mendipather (40 km) upgradation.

Evocrete - Strengthening and Improvement of Riding Quality East Garo Hills-Megahalaya on Songsak-Mendipather (40 km) upgradation

Surface: 82,500 m² under execution
Carried out: October 2014
Time needed: 3 Months
Milling depth: 30 cm
Concrete: 180 kg / m³ + 2% EvoCrete®


Meghalaya

Improvement Including widening to double lane on Songsak -Mendipathar Road (from 12th - 26 km) East Garo Hills.

Evocrete - Improvement Including widening to double lane on Songsak -Mendipathar Road (from 12th - 26 km) East Garo Hills

Surface: 85,000 m²
Carried out: January 2012
Time needed: 2 Months
Milling depth: 30 cm
Concrete: 170 kg / m³ + 2% EvoCrete®

Jalan Pekoti Timur

Renovation of an agricultural road in Jalan Pekoti Timur.

Evocrete - Renovation of an agricultural road in Jalan Pekoti Timur

Surface: 11 km
Carried out: August 2006
Time needed: 6 weeks
Milling depth: 30 cm
Concrete: 180 kg / m3
Task: Rehabilitation of an agricultural road, which leads through a palm plantation and is used by heavy weight trucks.


Sarawak

Drainage and Irrigation System and Flood Mitigation

Evocrete - Malaysia - Drainage and Irrigation System and Flood Mitigation 1
Evocrete - Malaysia - Drainage and Irrigation System and Flood Mitigation 2
Evocrete - Malaysia - Drainage and Irrigation System and Flood Mitigation 3

Beek en Donk

Evocrete - Beek en Donk

Surface: 2,500 m²
Carried out: December 2001
Time needed: 2 days
Milling depth: up to 70 cm
Concrete: 220 kg / m³
Task: Surface foundation to erect a warehouse without individual or strip foundations.
Compression of supporting elements directly into the EvoCrete® base layer.


Beek en Donk

Creation of base and anti-frost layers for the building of a public road in Beek en Donk.

Schipol

Manufacture of non-asphalted supply roads, that run parallel to the runways Schipol airport.

Babimost

Rehabilitation of forest paths in Babimost.

Evocrete - Rehabilitation of forest paths in Babimost

Surface: A total of approx. 25,000 m²
Carried out: June 2004
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³
Task: Creation of an EvoCrete® ST base layer and anti-frost layer for the forest paths used by vehicles transporting wood.


Wroclaw

Construction of a logistics centre in Wroclaw.

Evocrete - Construction of a logistics centre in Wroclaw

Surface: 22,000 m²
Carried out: December 2005
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³
Task: Creation of base and anti-frost layer for the building of shipping halls and traffic areas of a logistics centre.


Wroclaw

Technology park for LG-PHILIPS in Wroclaw.

Evocrete - Technology park for LG-PHILIPS in Wroclaw

Surface: 79,500 m²
Carried out: 2006 and 2007
Time needed: 6 weeks
Milling depth: 30 - 35 cm
Concrete: 170 kg / m³
Task: Creation of an EvoCrete® base and anti-frost layer for the industrial roads and hall floors of a technology park.


Babimost

Building of 6 km of forest roads for the forest management of Zielona Gora in Babimost.

Babimost

Creation of base and anti-frost layers for the building of 10 km of forest roads for the forest management in Zielona Gora in Babimost.

Kielce

Manufacture of base and anti-frost layers for the new storage building and associated parking and traffic areas for Castorama Hypermarket (22,000 m²) in Kielce.

Koszalin

Building of 6 km of forest roads in Manowo for the forest management of Koszalin.

Wroclaw

Building of an industrial complex for LG.Philips-LCD - Manufacture of base and anti-frost layers for the construction of industrial roads and warehouse floors in Wroclaw.

Wroclaw

Creation of base and anti-frost layers for the building of a logistics centre (53,000 m²) for the commercial enterprise NETTO in Wroclaw.

Wroclaw

Creation of base and anti-frost layers for the building of a metalworking company Tibnor in Wroclaw.

Wroclaw

Creation of base and anti-frost layers for the building of a production hall (78,000 m²) for the company LG HEESUNG in Wroclaw.

Wroclaw

Creation of base and anti-frost layers for the building of shipping halls and traffic areas of a logistics park for ProLogisPark Wroclaw.

Wroclawski

Creation of base and anti-frost layers for the building of a logistics centre and the attached traffic areas for the Schavemaker Group.

Arboga

Creation of the exterior area of a logistics centre for the Army of Sweden in Arboga.

Evocrete - Creation of the exterior area of a logistics centre for the Army of Sweden in Arboga

Carried out: June / July 2009
Time needed: ca. 8 weeks
Milling depth: 30 cm
Concrete: 180 kg / m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the creation of the exterior area of a logistics centre.

Aargau

Road rehabilitation at the NK 107 in the county of Aargau.

Evocrete - Road rehabilitation at the NK 107 in the county of Aargau

Surface: approx. 2,500 m²
Carried out: 24. + 25.07.2009
Time needed: 24 hours
Milling depth: 30 cm
Concrete: 180 kg/m³
Task: Creation of an EvoCrete® ST base and anti-frost layer for the renovation of a link road between two cities.


Suhr

Construction of cycle paths in Suhr.

Evocrete - Construction of cycle paths in Suhr

Surface: 22,000 m²
Carried out: 2007
Time needed: 1 week
Milling depth: 25 cm
Concrete: 170 kg / m³
Task: Construction of an EvoCrete® base and anti-frost layer for areas used by cyclists.
Created with near natural surfaces, without an additional asphalt layer.


Suhr

Ground improvement for new railway tracks at the WSB station in Suhr.

Evocrete - Ground improvement for new railway tracks at the WSB station in Suhr

Surface: approx. 3,000 m²
Carried out: June / July 2009
Time needed: 2 days
Milling depth: 30 cm
Concrete: 180 kg/m²
Task: Creation of an EvoCrete® ST base and anti-frost layers for ground improvement for new railway tracks in the county of Aargau.


Unterlunkhofen

Rehabilitation of a district road in Unterlunkhofen.

Evocrete - Rehabilitation of a district road in Unterlunkhofen

Surface: approx. 7,500 m²
Carried out: December 2006
Time needed: Milling 2 days, road laying 4 weeks
Milling depth: 25 cm
Concrete: 190 kg / m³
Task: Renovation of a link road, which would have taken 8 weeks (with complete road closures) to complete using conventional building techniques.


Construction of the cycle path R 623 for the Baudepartement Aargau (BVU) in Obersiggenthal-Freienwil.

Evocrete - Construction of the cycle path R 623 for the Baudepartement Aargau 1
Evocrete - Construction of the cycle path R 623 for the Baudepartement Aargau 2

Abtwil

Road fortification at the K 348 between Alikon and Abtwil.

Alikon-Abtwil

Fortifications of the district road K 348 for the Baudepartement Aargau (BVU) in Alikon-Abtwil.

Arislau

Fortifications of the district road for the Baudepartement Aargau (BVU) in Arislau.

Baar ZG

Creation of base and anti-frost layers for a barnyard and an agricultural road in Baar ZG.

Birmenstorf-Gebenstorf

Fortifications of the district road K 418 for the Baudepartement Aargau (BVU) in Birmenstorf-Gebenstorf.

Frauenfeld

Creation of base and anti-frost layers for the expansion of a warehouse with production technology sensitive to settlement in Frauenfeld.

Leuggern

Fortifications of the district road K 455 for the Baudepartement Aargau (BVU) in Leuggern.

Lupfig-Birr

Fortifications of the district road for the Baudepartement Aargau (BVU) in Lupfig-Birr.

Magden

Fortifications on the road to Helgestöckli for the community Magden.

Oberbözberg-Remigen

Fortifications of the district road K 457 for the Baudepartement Aargau (BVU) in Oberbözberg-Remigen.

Obersiggenthal-Freienwil

Rheinfelden

Creation of base and anti-frost layers for the renovation of a main through road in Rheinfelden.

Rheinfelden

Fortifications of the district road K 292 for the Baudepartement Aargau (BVU) in Rheinfelden.

Rickenbach

Fortifications and sanitation of a freight road for the community Rickenbach.

Staffelegg

Road fortification at the NK 107 (Staffeleggstraße) in the county of Aargau in Staffelegg.

Suhr

Creation of base and anti-frost layers for a farmyard access in the community of Suhr.

Suhr

Sanitation of a cycle path for the Baudepartement Aargau (BVU) in Suhr.

Suhr

Soil improvement for the new railway tracks at the station of Suhr AG.

Tegerfelden-Zurzach

Fortifications of the district road K 286 for the Baudepartement Aargau (BVU) in Tegerfelden-Zurzach.

Trägerwilen

Creation of base and anti-frost layers for the heavy goods vehicle area of Storz Medical in Trägerwilen.

Unterlunkhofen-Lieli

Fortifications of the district road for the Baudepartement Aargau (BVU) in Unterlunkhofen-Lieli.

Vordemwald

Road fortification at the K 304 in the county of Aargau in Vordemwald.

Wislikofen

Fortifications of the district road K 431 for the Baudepartement Aargau (BVU) in Wislikofen.

Construction of roads, access roads, drilling pads, yards, etc.

Evocrete - USA Construction of roads,  access roads, drilling pads, yards

Laredo - Texas

Creation of base and anti-frost layers for the restoration of the high speed testing track for Daimler Chrysler AG in Laredo.

Evocrete - Creation of base and anti-frost layers for the restoration of the high speed testing track for Daimler Chrysler AG in Laredo

Surface: approx. 10,000 m²
Carried out: May 2004
Time needed: 2 weeks
Milling depth: 25 cm
Concrete: 160 kg / m³
Task: Renovation of a lane and creation of an EvoCrete® base layer.


Greeley - Colorado

Stabilzation of Vara drilling pad nearby Greeley.

Evocrete - Stabilzation of Vara drilling pad nearby Greeley

Palasdine - Colorado

Grand Valley High School, access roads and parking lots.

Evocrete - Grand Valley High School, access roads and parking lots